Sequoia Park
Multi-family Residential Exterior Construction
Location: Beaverton, OR
Management: Community Management, Inc.
Scope of Repair: Full replacement of roofing, gutters, and downspouts. Replacement and insulation of all attic exhaust fan ducting. Upgraded attic ventilation system. Additional attic insulation blown in to reach R-49. Replacement of siding on all wall sections above roof transitions. Painting of new siding.
Products Used: CertainTeed Landmark shingles, HardiePlank siding, Sherwin-Williams SuperPaint, Owens Corning fiberglass insulation, 6” gutters, and 3” x 4” downspouts.
Project Size: 5 residential buildings; 68 units; 35,000 SF roof area.
5,200 SF siding area.
Project Remarks: In addition to top notch siding and roofing installation, our team solved major issues with condensation in the attics and ducts that have plagued these buildings for decades.